Agilent-technologies N2620A Manuale Utente Pagina 51

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 279
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 50
Network Testing with the FrameScope Pro 2
N2620A User’s Guide 33
5
Press Start to begin the TraceRoute test. The TraceRoute
Results screen will be displayed.
6 Observe the results of the TraceRoute test.
The screen will show the number and address of each hop. In
addition, the delay (in seconds) to each hop is shown. The
delay is cumulative, but since each termination is measured
individually, an anomaly may exist where an intermediate
time is greater than a subsequent time due to network
performance.
7 Press Start to run the test again.
Vedere la pagina 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 278 279

Commenti su questo manuale

Nessun commento